UGV intends drilling the first exploratory wells in the Zhdeniivska area
Ukrgasvydobuvannya JSC (UGV) plans to construct well No. 1 on Zhdeniivska oil and gas area, in Lviv region. This is reported in the EIA Register.
If positive results are obtained after drilling the first well, it is planned to conduct prospecting and exploration works with further development of Zhdeniivska area by building 2 wells per year, and tie-in of the well to the hydrocarbon raw materials treatment unit.
The design depth of the wells is up to 2,600 m, the drilling method is rotary and turbine. It is also planned to run high-pressure casing in the well. It is also planned to tie-in a well at a distance of up to 10,000 m to the hydrocarbon preparation plant laying gas flowlines. Work on the implementation of the planned activities will be carried out by the Lvivgasvydobuvannya Gas Production Department. The expected volume of natural gas production for each well is 15-30 thousand cubic meters a day.