UGV has completed well #365 of the Yablunivske field with a flow rate of 122 tcm per day

Ukrgasvydobuvannya (UGV) has commissioned a new well #365 at the Yablunivske oil, gas, and condensate field (OGCF). This is reported by Poltavagasvydobuvannya GPU.

According to the testing results, the initial flow rate of the specified well is 122 tcm per day. The well depth is 5,115 m. Drilling was carried out by in-house drilling contractor Ukrburgaz.

Recall that in the immediate intentions of the company construction of three more wells (# 367, 368, and 369) within this field, this was reported in the EIA register at the end of last year.

17:35 / 26 May 2021

Articles
More articles