Three companies want to take part in UGV tenders for the hydraulic fracturing for $64 million
Service Oil LLC, Reno Services LLC, and Tacrom Ukraine LLC submitted documents for participation in two UGV tenders for hydraulic fracturing services at UGV fields. The total cost of both tenders is UAH 1.79 billion (with VAT); the total scope of work is 400 operations. This was reported on ProZorro.
Recall that the specified tenders were announced on December 23, 2021:
- Provision of hydraulic fracturing services in the scope of 160 well operations with an expected cost of UAH 599.5 million.
- Provision of hydraulic fracturing services in the scope of 240 well operations with an expected cost of UAH 896.5 million.
According to the terms of reference for both tenders, most of the fields that provide for hydraulic fracturing operations are located in the eastern part of Ukraine, near the city of Poltava. However, some of the fields are located in Western Ukraine.
Auctions in both tenders are scheduled for March 1, 2022. The service delivery period is until December 31, 2026.

14:00 / 15 February 2022
Articles
11:16 / 2 January, 2026
Gas imports to Ukraine hit a five-year high at 6.5 bcm in 2025
10:29 / 16 July, 2025
Ukraine’s Recovery: Energy as a Priority
11:50 / 2 July, 2025
Ukraine boosts natural gas imports twelvefold
13:22 / 27 May, 2025
Gas prices in Ukraine surge: Highest level in over two years
13:17 / 26 May, 2025
Ukraine injects over 1 bcm of gas into storages
12:09 / 19 May, 2025
Special Issue: When Will Europe Switch to SDAC 15-minute intervals?
10:05 / 3 February, 2025
Special materials: Energy Mix of Neighbouring Countries in 2024: Coal, Nuclear, and the "Green" Path
