DTEK connected another power unit to the power system after repairs
DTEK Energo connected another power unit to the power system after scheduled repairs. In the near future, it is planned to increase the unit's capacity to 170 MW. This was reported in the press service of DTEK.
"Renovated capacities make it possible to increase the operation of thermal generation in the heating season and peaks in electricity consumption," DTEK said.
During 2023, as part of the annual planned repair campaign, DTEK Energo carried out 24 repairs of power units. Investments in the repair campaign, according to preliminary data, amounted to about 4 billion hryvnias, which is almost twice as much as a year earlier.
12:08 / 16 January 2024
Articles
11:16 / 2 January, 2026
Gas imports to Ukraine hit a five-year high at 6.5 bcm in 2025
10:29 / 16 July, 2025
Ukraine’s Recovery: Energy as a Priority
11:50 / 2 July, 2025
Ukraine boosts natural gas imports twelvefold
13:22 / 27 May, 2025
Gas prices in Ukraine surge: Highest level in over two years
13:17 / 26 May, 2025
Ukraine injects over 1 bcm of gas into storages
12:09 / 19 May, 2025
Special Issue: When Will Europe Switch to SDAC 15-minute intervals?
10:05 / 3 February, 2025
Special materials: Energy Mix of Neighbouring Countries in 2024: Coal, Nuclear, and the "Green" Path
