Goryzonty plans to drill two wells in the Hirska area
Goryzonty LLC plans construction of exploration wells #27 and 28 at the Hirske field to identify gas deposits in the Lviv region, Stryi district, the EIA Register reads as of December 6, 2021.
It is planned to build wells #27 and 28 with a depth of 1,500 m.
Drilling will be carried out using a diesel-powered drilling rig. Work on well tiein is designed for a period of up to three months.
It should be noted that at the end of October, the Goryzonty Drilling Company, which, like Goryzonty LLC, is part of Zakhidnadraservice Group, reported drilling well No. 18 in the Hirske gas field using an Ideco SBS Dir-806 drilling rig with a lifting capacity of 160 tons. Additionally, at that time, 2 more wells were drilled at the Group's assets. These were #2-Hrabynska with a design depth of 1,500 m, drilled using a Cardwell KB 200 drilling rig with a lifting capacity of 125 tons, and #9-Bystrytska with a design depth of 1,500 m using Dragon XJ 1000 drilling equipment.


