Energoatom and Westinghouse sign memorandum on construction of 5 NPP units

The NNEGC Energoatom and the American engineering company Westinghouse signed a memorandum on the construction of 5 units using the technology of an American partner.

This was announced by the President of Ukraine Volodymyr Zelensky on August 31, 2021, during his visit to the United States.

"I welcome the signing of the memorandum between NNEGC Energoatom and Westinghouse Electric on the joint construction at the Khmelnytskyi NPP as a pilot project, and in the future - 4 more units based on their technology," the President wrote on his Twitter.

According to Zelensky, the total cost of the project is up to $ 30 billion.

16:36 / 8 September 2021

Upcoming events
09:00 / 23 September, 2021
09:00 / 20 May, 2021
08:00 / 26 September, 2019
ODESA OFFSHORE CONFERENCE-2019 Ukraine has every chance to resume the work of the most promising oil and gas region, the Southern oil&gas fields. The untapped deposits of oil and gas are located both onshore and subsea. Four companies have already poised to conclude Production Sharing Agreements with Ukraine, whilst bidding for the Dolphin oil&gas fields on Black Sea shelf. The Odesa Offshore Conference (OOC2019) will serve as a venue for Ukrainian and international bidders to meet with local and international drilling, oilfield service and equipment manufacturers to kick-off emerging subsea and onshore projects in Ukraine.
ODESA OFFSHORE CONFERENCE-2019
All events