Burisma Group drilled 2 wells, one of which is 330 thousand m 3
The Burisma Group announces the completion of drilling # 9 with a depth of 3900m in the Rokytne field, and well # 42 with a depth of 5490 m in the Karaykozivske field in Kharkiv region. It is published on company`s webpage on November 1, 2019
Director of the Board of Directors of Burisma Group Karina Zlochevska said the drilling of the wells mentioned above was successfully completed in September. In particular, the directional well # 9 of the Rokytne deposit was drilled with the help of the American Garden Denver drilling rig in less than 2 months against the planned 3-4 months. As a result, they received a high flow rate of the well - 330 thousand m 3, which is 50% higher than expected.
The company also reported that during the drilling of well # 42 at the Karaykozivske field, some difficulties arose, that due to the operational correction of drilling, the expected productive horizons were successfully reached at a depth of 5380m.
Expro Reference:
Burisma Group unites a number of production and service companies in Ukraine and abroad, in particular, Esko-Pivnich , SystemOi Engineering, Aldea, KUB-Gas, First Ukrainian Gas and Oil Company, Pari, Gasoilinvest, Nadragas, NGPGeo. Burisma Group produced 955 million cubic meters of gas in 2018 (25 million m 3 (2.7%) more than in 2017). Condensate production doubled to 72,000 tonn